I begin migration planning with records and workflows that outlive the systems that created them. A ten-year archive, a signed software release and an encrypted partner connection have different cryptographic dependencies and replacement windows.
Establish who can change each dependency
Record the protocol, library, key type, algorithm, data lifetime, owner and migration constraint. Ask which parts a supplier controls, which verifiers must interoperate and how older signatures will be validated after the transition. Include trust stores, certificate chains and archival verification environments.
Stage and test the transition
NIST FIPS 203 addresses key establishment, while FIPS 204 and 205 address digital signatures. Prioritize tests by the life of the protected information, exposure and ability to replace the dependency. Validate representative key establishment and verification paths, failure modes, performance and rollback with the parties that operate them.
Keep the proof with the decision
The record should show what moved, which build and library were tested, whether downstream verifiers worked and who accepted the remaining exposure. A board can use the same inventory to revisit sequencing when a supplier or standard changes.